Simulation of north vietnam power system restore from black out

Authors

  • LÊ CÔNG THÀNH

Abstract

     Applying matlab/simulink to simulate the North Vietnam power system restore process has taken to main influence factors such as the participation level of the power plants on the system; stability of automatic generation control; power reserve. Suggestion: restore power subsystems at the same time in the subregions, with the participation of the new power plants.

Downloads

Download data is not yet available.

Published

2015-12-27

Issue

Section