Determination of water level -discharge relationshipfor flow diversion through under construction dam and culvert

Authors

  • MAI LÂM TUẤN

Abstract

     For flow diversion, multiple diversion diagram for a simultaneous discharging through various structures is often used, including under construction dam and culvert (combined flow). This calculation must be done by using trial and error method. This paper will present the method and computation diagrams for combined hydraulic flow calculations. The computer program will be a tool for designers to determine the parameters of diverting structures.     