FORECASTING CONSTRUCTION SCHEDULE OF BORED PILE WITH DISCRETE EVENT SIMULATION TOOL

Authors

Keywords:

Discrete Event Simulation, EZStrobe, bored piles construction, construction schedule

Abstract

The paper conducts EZStrobe program to simulate the construction process of a bored pile. A simulation model, which with detailed activities of bored pile construction, has been developed to analyze and predict the construction time of a pile with random work times. The model and simulation results are also compared and evaluated with a published study, showing the suitability and high efficiency of the established model.