More than 1,900 billion Vietnamese Tri new bridge construction

Authors

  • Phóng viên

Abstract

The project includes a new bridge sections Vietnam Tri located on Highway 2, across the Lo River, part of the path toward Vinh Phuc, Phu Tho and bridges on the path, with a total length of over 3.7 km bridge and road (paragraph exceed 736 m long river) is designed with reinforced concrete.

Downloads

Download data is not yet available.

Published

2016-11-06

Issue

Section

6. ĐẦU TƯ – TÀI CHÍNH – NGÂN HÀNG